Insulation of a wet facade with your own hands, technological map

I have already written about wet façade technology 3 times, after I experienced the work of insulating a house using the VWS (expanded polystyrene) system by one Astrakhan specialist “from a company” with a Ceresit certificate. I had to delve into it so as not to ruin the sowing season from the word “completely.” To make it easier to find information, below is a list of posts with an analysis of wet facade technology:

  • what kind of insulation to use for a wet facade, polystyrene foam or mineral wool, what reinforcing mesh to choose, etc., you can read about all this HERE (Wet facade for the lazy);
  • what thickness of insulation to choose, 50 or 100mm, read HERE (What thickness of insulation to choose);
  • how to perform a smooth finish on a wet facade, read HERE (Smooth finish);
  • download instructions for a wet façade for printing, and the organization standard (STO) HERE;

Since there is never too much good information, and even more so for work that is sensitive to adherence to technology, which is the wet facade insulation technology. I decided that spreading good information would benefit everyone. Moreover, the author does not mind.

General appearance, wet facade using the VWS Ceresit system / (c) Ceresit

I highlighted some points to draw your attention. Critical information is highlighted in red. Yellow requires attention, blue is of general importance.

Characteristics of the plaster layer and external coating

It is important to take into account that the plaster layer must also meet certain characteristics. So, the layer density should be in the range from 145 to 200 g/m2

whereas the thickness should be approximately 3-5 mm.

It is important to choose the right material for the decorative layer, which must have increased vapor permeability characteristics. But it is recommended to choose a density equivalent to 1.6 g/m3

If you comply with all these requirements when choosing a material, then the wet facade will meet all the characteristics of a high-quality system that will last for as long as necessary.

The “wet facade” finish today continues to be popular for the reason that the house looks very presentable after the work, and the costs do not break the owners’ pockets.

We recommend checking out: https://fb.ru

Application of decorative plaster

A very important stage for both the façade builders and the home owner. First you need to choose the type of plaster, because this determines how aesthetically pleasing your house facade will look.

There are 3 types of decorative plaster

  1. Pebble (root, lamb)
  2. Bark beetle
  3. Fur coat

The most common decorative plaster is pebble plaster. In our work on insulating houses in Moscow and the Moscow region, the choice of house owners falls precisely on root with a fraction of 2 mm.

In second place in popularity is the bark beetle. Very interesting textures can be obtained using this decorative material. This plaster got its name due to its textured patterns, reminiscent of the passages of bark beetles in wood.

Fur coats for private homes are not very popular, as they look quite rough in small quantities. However, on large administrative buildings or multi-story buildings, the texture of the fur coat looks excellent.

Decorative plaster is applied using spatulas in small areas of approximately 2 m2 to prevent rapid drying of the plaster, especially at the border.

Then, after applying a layer of decorative plaster, using a special plastic trowel, a certain texture and pattern of the facade is set.

Flaws

Almost all of the disadvantages of this method of thermal insulation of a room are associated with the installation process. These are certain requirements that cannot be neglected in order to achieve a high-quality surface with a long service life. Failure to follow the recommendations can negate all the benefits and only bring disappointment in the work performed.

Temperature

When installing a wet facade, you need to take into account the temperature recommendations of the manufacturers of adhesive and plaster compositions. The permissible operating range for working with them is approximately from -5 to +50 degrees Celsius (the exact parameters are indicated by the manufacturer on the packaging). When working in the cold season, in order to avoid uneven hardening of the mixture, you will have to build a polyethylene cover to protect the adhesive composition from hypothermia. At subzero temperatures, you will need a heat gun, and it must work until the mixture completely hardens, and this depends on the thickness of the layer, in some cases - up to 24 hours. The amount of electricity spent on drying cancels all the advantages of the design associated with its low cost.

Air humidity

Another disadvantage of the “wet facade” technology is the strict requirements regarding ambient air humidity. The fact is that with a relative saturation of the atmosphere with water vapor of more than 40%, uniform drying of adhesive and plaster mixtures cannot be achieved. As a result, spots of untimely hardened plaster will appear on the surface. The same conditions apply to working in the rain.

Excessive heat

Strict adherence to temperature conditions during installation are the main disadvantages of the wet façade design. Installation in hot weather, as well as under the influence of direct sunlight, is unacceptable for this technology. Excessive heating of a separate area of ​​the surface or the entire wall can lead to accelerated evaporation of liquid from the finished plaster mixture. Thus, the surface will harden, but in violation of the technical conditions, which will lead to premature cracking and peeling of the plaster layers. Comparing all the pros and cons of wall insulation using the “wet facade” technology, we can conclude that in fact such thermal insulation is positively different from most known options.

Practical recommendations

If the base is insulated, then you need to adhere to the recommended technologies to the maximum extent possible. The surface of the base must be plastered and impregnated several times with a waterproofing solution before gluing the slabs. The fact is that concrete absorbs a lot of moisture, it will get on the glue. And polystyrene foam eliminates the possibility of evaporation, water accumulates under it, expands during freezing and the slabs will fall off, they will only be held on by dowels. If the base is then covered with rather heavy finishing materials, then with their weight they deform the foam plates. At best, the surfaces will become uneven; at worst, you will have to remove materials and repeat the insulation of the house from the beginning.

Base finishing, diagram

In the absence of experience in performing such work, it is difficult to know whether the foam is securely glued. We recommend doing a test gluing. Apply the solution around the perimeter and in the center, place the sheet against the façade wall and level its position. Immediately remove the foam and look at the glue marks on the wall. They must be uniform over the entire area, and the total area must be at least 40% of the sheet size. Such a simple test will make it possible to further focus on the amount and location of glue application. In addition, you will feel how hard you should press the foam sheet against the façade wall.

Testing, samples

Samples were torn from the wall, the result allows us to judge the quantity and quality of the glue

High-quality glued polystyrene foam is difficult to tear off from the wall

Always start installing a row from a corner and from the whole slab. If a whole slab does not fit at the opposite corner, then it must be cut to size and used second to last, and the last one must be intact. As a last resort, the area where the foam is glued should be twice the area of ​​the part protruding beyond the corner of the house. Do not forget that the slab should protrude beyond the corner of the building by its thickness; in this place, the insulation from the two walls should overlap. It’s better to make a protrusion with a reserve, the excess will be cut off later. The solution should not get on the protruding part of the slab. The next rows of polystyrene foam are installed on top of the previous ones in gearing. The tighter they fit, the more secure the fastening. The outer corners have the greatest load, and you can’t protect yourself with dowels, remember this and carefully carry out all operations. The slabs on the wall must be placed staggered; vertical seams on the wall must not overlap.

Checker board installation diagram

Check the position of the first row especially carefully; it is this that sets the level for the entire wall. It is recommended to lay subsequent rows only after the glue on the first one has completely cured and fixed it with dowels.

Layout of dowels for fastening foam boards

Do not allow glue to get into the joints between the boards. Why? Cement mixtures have high thermal conductivity and form cold bridges. They will become noticeable on the façade walls in the form of wet stripes. There are cases when such imperfections cannot be hidden even with decorative plaster. The stripes are not permanent and appear or disappear depending on climatic conditions.

The main task of the reinforcing mesh is to protect the foam from mechanical damage. Experienced builders know that it is impossible to clean foam from dried high-quality glue without damaging the surface. This means that the role of the mesh in holding the plaster is minimal. If the mass falls off, repairs cannot be avoided anyway; the plaster will sag on the mesh. Hence the conclusion - reinforcement must be done in those areas of the facade wall that can be damaged by mechanical forces, as a rule, no higher than 1.5 m from the base. Everything above is at your personal discretion.

Reinforcing mesh

You can cut foam boards with a fine-toothed hacksaw. But this is not the best option. A much smoother cut is obtained after cutting with heated nichrome wire. It can be bought in specialized stores; the length of the wire depends on the diameter. Stretch the wire in a convenient place and connect to the outlet. Uneven cut edges after a hacksaw can be smoothed with a special grater.

How to cut foam

Foam cutting knife

Video - Device for cutting polystyrene foam

Extruded polystyrene foam has very low adhesion to adhesives. Before use, be sure to scrape it on both sides with a grater until shallow grooves appear.

Video - Preparing polystyrene foam for gluing

Do not use this material as the main thermal insulation; it can only be used to finish the base. And then only in cases where the finishing of these surfaces is done with heavy materials.

The exterior of the house was created using wet facade technology

Installation of a wet facade

The structure of such a facade is distinguished by the presence of three main layers:

Thermal insulation. Fixed on a bare wall with glue. As a rule, for a wet facade, glue is used in the form of a polymer-cement solution, which has excellent adhesion to both the load-bearing surface and all types of insulation. Polystyrene foam is mainly used as insulation for private houses. In addition, quite hard mineral wool slabs are often used.

Installation of a wet facade

  • Base layer. It creates a fairly rigid layer that protects the insulation from various mechanical influences, while acting as the basis for the design of a decorative coating. Most often, a polymer-cement mortar and a reinforced mesh with glass fiber impregnation that protects against alkali are used for this purpose.
  • Decorative coating. Quite often it is practiced to cover a wet facade with textured plaster. It is characterized by ease of implementation, reasonable price and low weight. Thus, heavy porcelain tiles cannot be mounted on polystyrene foam or mineral wool with a thin reinforced mesh.

Step-by-step execution of work

Throughout the entire working area, it is necessary to seal existing cracks and cracks and, if possible, get rid of pronounced irregularities.

Creating an insulating coating

Typically, mineral (basalt) wool is used to create a thermal insulation layer. This material has a fairly dense structure and has acceptable tensile strength.

The use of foam sheets (expanded polystyrene) is not excluded. But in this case it is necessary to choose a special low-flammable material.

Structure with polystyrene foam: 1 - layer of paint; 2, 4 - primer; 3 - plaster; 5, 7, 10 - adhesive solution; 6 — reinforcing mesh; 8 — polystyrene foam; 9 — hat dowel; 11 - soil; 12 - brick

Expanded polystyrene has been developed for the “wet facade”, which has optimal insulating properties for such systems. The material is made using technology that takes into account the use of different structures on facades.

The basis of façade expanded polystyrene is raw material tested by fire testing (GOST 31251). The material is documented as PPS 16F (facade grade according to GOST 15588-2014). The density of PPS 16F approaches values ​​of 16.5–18.5 kg/m3.

Based on the fire test performance, the insulator was assigned a fire hazard class - K0. Therefore, polystyrene foam PPS 16F is allowed to be used as insulation for thermal insulation of facades.

The use of expanded polystyrene is characterized by making cuts along the perimeter of each sheet. Such cuts are filled with mineral wool. This is an additional fire safety measure.

Basalt wool is recommended as the optimal insulating material for a wet façade. In addition, this choice provides a high level of fire protection

Thermal insulating sections made of mineral wool are initially fixed with glue, and then additionally attracted to the wall with “hat” dowels.

Adjustment, reinforcement, plastering

After cladding with slabs, work is carried out to adjust the insulation in window and door openings. “Contiguous” systems and reinforcement in corners, depressions, and slopes are also made there.

The next step is to lay a reinforcing mesh over the insulation and secure this material to the wall in a checkerboard pattern using the same dowels.

Next, the first layer of plaster (4-6 mm) is applied to the mesh. A day later, another layer is applied - the main one - and covered with a dye of the appropriate color.

It would seem that the “wet facade” technology is simple and understandable. However, in practice, the execution of a “wet facade” is professional, with high quality, and is available only to specialists. Without work experience and knowledge of construction features, it is difficult to achieve high-quality results.

Choosing insulation for the structure

The main purpose of a wet facade is to insulate buildings, so much attention is paid to choosing high-quality insulation. It must meet the following criteria:

  • small weight;
  • environmental friendliness, since the work is performed for a residential building;
  • low water absorption rate;
  • good resistance to mechanical stress;
  • even with a sharp change in temperature, the material should not change its structure;
  • installation must be simple and cost low.

Only some thermal insulation materials meet these requirements. These include:

  • polystyrene foam - has a specific structure, which contains a huge number of closed air bubbles. It has low cost and is also easy to install. It has a small mass, so it does not affect the foundation and other parts of the structure. Resistant to mold or mildew growth. Its disadvantages include poor breathability. It is also not durable, so even minor mechanical impacts easily lead to its destruction. It is not advisable to use it for wooden buildings;
  • expanded polystyrene is a modern type of polystyrene foam. In the process of creating a wet facade, preference is often given to polystyrene foam. Its structure also contains numerous closed air bubbles, so it has good thermal insulation parameters and does not allow moisture to pass through. It is resistant to fire and has a low mass. The material is considered unsuitable for wooden houses because it impairs their breathability;
  • mineral wool - created using special fibers obtained by melting all kinds of rocks. The material is popular because it contains only natural and environmentally friendly components. Cotton wool is lightweight and affordable. The disadvantages include the lack of resistance to moisture, due to which mineral wool loses its thermal insulation parameters.

Mineral wool is most often chosen for wet facades. It is available in slabs that are easy to attach. To insulate a building using this material you will not need to spend a lot of money.

Foam plastic Expanded polystyrene Mineral wool

Types of decorative plaster

The following types of decorative plaster are presented on the Russian market:

  • Mineral
  • Acrylic
  • Silicone
  • Silicate

Read about the features of decorative plaster and the secrets of making the right choice in our article “decorative plaster for facades”

The most common facade plaster is mineral. Due to its relatively inexpensive cost and high productive qualities, mineral plaster is the leader in popularity.

Mineral plaster is supplied dry. It must be diluted with water to obtain the desired consistency. Mineral plaster is highly reliable, so it is most often chosen for wet facades.

Acrylic, silicone and silicate decorative plasters are sold ready-made. They do not need to be diluted with water. You just need to open the lid of the jar.

As a rule, these types of plaster are tinted immediately, so the subsequent stage of painting the house is not required.

Collection of materials

When preparing for finishing and insulating walls, you need to clearly understand the composition and sequence of technological operations.

This point is especially important in the case when the owner of the house decided to make a wet facade with his own hands.

For private, small houses, this approach is quite justified. During the installation process, a person will acquire primary finishing skills and become familiar with different types of insulating materials in practice.

Craftsmen who are engaged in finishing multi-storey buildings are given step-by-step instructions on how to perform technological operations and rules for handling materials.

Fastening is done either using dowels, or the insulation board is fixed with glue.

To ensure the necessary adhesion of the plaster mortar and thermal insulation material, a reinforcing mesh is used.

The mesh gasket not only reliably connects certain layers of the sandwich, but also gives the finishing layer the necessary rigidity.

A sand-cement mortar is applied to the mesh, and a decorative layer of plaster is applied on top of the mortar.

Photo:

Choice of insulation

At the preparatory stage, before starting the installation of wet facade elements, you need to select the insulation suitable for a particular house. The customer must give preference to mineral wool or polystyrene foam.

It should be immediately warned that mineral wool, well known to all builders, is not suitable for use in a wet facade system.

The fact is that this insulation tends to lose its initial parameters over time. For wet finishing and insulation processes, high-density basalt wool is used.

Its operational parameters fully comply with the technical conditions for installing a wet facade.

The technology for insulating private houses involves using not only basalt wool as insulation, but also using polystyrene foam.

When drawing up cost estimates for finishing and insulating the facade, the work contractor needs to compare these materials according to the following parameters:

  • vapor permeability;
  • manufacturability;
  • insulation cost.

Basalt wool has optimal vapor permeability, which allows the walls of the house to “breathe”. At the same time, it is more convenient to work with polystyrene foam, and it is noticeably cheaper than cotton wool.

Before choosing a specific insulation, you need to evaluate the pros and cons of each of them.

Photo:

Glue and reinforcing mesh

A fiberglass reinforcing mesh is applied to the insulation, which is glued to the wall or secured with dowels.

In this way, two problems are solved: firstly, the entire multilayer system becomes more durable, and secondly, the mesh, as an intermediate layer, ensures reliable adhesion of the plaster mortar to the insulation.

It is impossible to achieve high-quality and durable adhesion of two layers of a wet facade in any other way.

The technology of finishing house facades using the wet method has become widespread as a result of the appearance of a special glue on the market.

Video:

The plaster-adhesive mixture, which is produced using original technology with the inclusion of special polymer additives and binding minerals, has the necessary plasticity, strength, frost resistance and moisture-repellent properties.

To have a clear idea of ​​how to work with this glue, there are step-by-step instructions.

If adhesion is strengthened when installing a wet facade, a brittle layer may form on the surface of the plaster.

To avoid such a result, all finishing operations must be done in strict accordance with the current instructions.

Preparing for work

Before proceeding directly with installation, you need to select the material for the insulation. It was already mentioned above that mineral wool is better suited as such. But it can be different.


The insulation must withstand the plaster on the front side and the glue on the other. It should be dense and not afraid of compression or delamination. No glass wool or slag wool, only basalt wool of increased strength and density. Some manufacturers produce a ready-made version specifically for a wet facade.


The thickness of the material also plays a role. Too small a thickness will not produce the desired effect, and too much will lead to condensation accumulation. The thickness is selected from the standard indicators for a particular region. In addition to the insulation itself, you will need other materials and tools.

Base profile for the bottom row. Its width must exactly match the thickness of the insulation. To fix the profile you will need connectors. With their help, the profile will stand straight. The connector is placed one at a joint if the thickness of the insulation is less than one hundred cm. And if more, then two. The profile must be fixed. Dowel nails are used for this purpose.


The length of the nails varies depending on the wall material. Concrete and brick walls - 4 cm. Empty brick - 6 cm. The pitch between dowels is calculated from the thickness of the insulation. More than 8 cm, step - 3 cm. Less - step - 5 cm. The dowel is secured with a spacer washer.

Priming is a necessary step for a more durable fixation. A coat of primer increases adhesion and increases protection. It must be applied, so you will need a deep penetration primer.


The insulation is fixed with glue. Therefore, the solution must be special for attaching the thermal insulation layer. Manufacturers often indicate on the insulation itself the optimal solutions for a given material. Dowel mushrooms will be needed to secure the insulation. Their length should be the same as the thickness of the insulation and spacers.

A suitable option would be to use the same glue in this capacity. You will also need a reinforcing mesh. And also the corners that will cover the corners along the entire height of the corners. For cladding you will need decorative plaster or paint. It all depends on your personal preferences.

Preparing walls for work

The insulation process consists of several stages, among which there are those that are not directly related to installation, but for that reason they are no less important. Failure to do one of these could result in a poor-quality installation and subsequently wasted effort and materials.


Preparation is one of these stages. At first glance, it seems insignificant, but how well the material fits depends on proper preparation. The glue will adhere well only to a clean surface. The old layer of plaster or paint must be completely removed, otherwise the adhesive may come off. You can heat the wall with a hair dryer or use special solutions to remove old finishes.

It would be a good idea to wash the wall too. If you direct a strong pressure of water onto the wall, this will save you from many contaminants: stains or peeling plaster. But after that it must be allowed to dry. Mold and mildew also need to be removed and then treated with a bactericidal solution.


To prevent microflora from forming on the wall, it is subsequently treated with an antiseptic. If there are irregularities, they need to be repaired. Putty is suitable; it must be applied tightly and leveled to the general level of the wall. On the contrary, all potholes are removed.


Check the walls for slopes. Deviations of more than 2 cm must be corrected immediately. Cement plaster is suitable for these purposes. But you will have to wait for it to dry completely, which may delay the repair. After all the work is completed, the walls are primed. If the base material absorbs well, then two layers will be needed.

Wet front pie

Based on the fact that the façade is subject to constant exposure, the choice of finishing method is very important. You need to choose a method that guarantees protection from moisture and wind, insulates the room, and the material will not fade in the sun. One of the most reliable and high-quality types of finishing is the wet facade of the house.

The wet facade method means multi-layer application of various types of finishing materials, which as a result will create complete protection of the facade. A few words should be said about the technology of constructing a wet facade:

First layer

The first layer of a wet facade should protect the material of the load-bearing walls, create good steam and wind protection, on which subsequent layers will be applied.

Second layer

The second layer of the wet facade must be made of some kind of insulation. The insulation system for a wet facade can be as follows:

  • Styrofoam;
  • dense mineral wool;
  • polyurethane foam.

Third layer

The third layer of the wet facade should be made of a reinforcing mesh, which will hold the insulation, and on which the finishing will need to be applied.

Fourth layer

The fourth layer, that is, the finishing layer, can be made of any finishing materials that can be applied or glued to the reinforcing mesh:

  • ceramic tiles or porcelain stoneware;
  • decorative plaster or bark beetle;
  • decorative or natural stone.

Thus, it becomes clear that finishing the facade using the wet method is a good substrate for any finishing material that can be applied in this way.

The beginning of façade insulation

Facade plaster using insulation technology

At what stage of construction is facade work carried out?

  • When the roof installation is completed;
  • External waterproofing of the foundation has been completed;
  • Shrinkage of the house has already occurred;
  • Windows, ventilation, air conditioning and other systems have been installed;
  • The building has been dried out;
  • Weather with a stable above-zero temperature is expected for 2-3 weeks (beginning of autumn or end of spring, facade work “does not like” heat or frost).

Preferred, but not required:

  • We completed the initial finishing of the interior walls, concrete work, pouring and screeding of floors;
  • Installed electrical wiring, alarm, etc.;
  • The building is heated (for the cold season).

The main steps will be listed below in order to understand how to insulate a wet facade. Each “system” seller provides installation instructions, taking into account the installation features of this particular system. Don't forget this.

Wet façade fastening system

There are three main types of fastening of a “wet” facade. The first method of fastening is rigid. When using it, the insulation is fixed with dowels. Due to this type of fastening, it is possible to achieve particularly thin plaster layers with a thickness of no more than 5-8 mm.

With the second fastening method, the insulation is attached to the wall using movable hinges. Thanks to this, the system moves freely along the wall, compensating for shrinkage and other loads on the facade. The thickness of the plaster layers in this case is about 30 mm.

The third option is the most common. It involves the use of both glue and dowels. First, the insulation is attached to the wall with glue. After which it is fixed to it with dowels. Sometimes only one glue is used. However, this method of fastening is applicable only to perfectly smooth walls, and only on condition that 90% of the insulation is glued. It is worth noting that fastening using dowels and glue is the most common. This is due to the fact that the dowel bears the wind - the main load acting on the facade. Over time, the dowel becomes loose under the influence of wind. To prevent this, the insulation is fixed with a plaster-adhesive layer. In addition, using this layer the walls are leveled.

The general rule for all fastening methods is to arrange the insulation in a checkerboard pattern. This is done in order to avoid cracks in the finish coating. The latter cracks if the vertical seams of the lower and upper rows of insulation coincide. In addition, the applied adhesive layer must cover at least 40% of a single insulation board. The dowels are installed after the adhesive layer has dried. The most commonly used are disc dowels with wide-diameter caps. Moreover, two types of dowels are used more often than others: screw dowels with a spacer element in the form of a screw, and driven dowels with a spacer element in the form of a nail. The choice of one of the two types of dowels depends on the type of wall being insulated. For walls made of hollow bricks and foam concrete, screw dowels are selected. If the walls are made of solid brick or reinforced concrete, driven dowels are used.

The dowel is the most important fastening element, as it passes through all layers of the wet facade. As a result, a thermal conductivity coefficient close to zero is especially important for it. If this coefficient does not have a minimum value, the dowel will become a kind of bridge for delivering cold to the load-bearing wall of the building. An almost 100% solution to this problem is to use a dowel with a metal rod in a plastic shell. This dowel has a thermal head. The plastic shell of the rod must be alkali-resistant, and the rod itself must have a zinc coating of at least 5 microns. The zinc coating protects the dowel from corrosion, which can occur due to the formation of condensation on its rod. In addition to the above, dowels must withstand temperature changes from minus 55 to plus 80 Celsius.

The number of dowels themselves per 1 sq. a meter of wall is determined based on the wind load, the weight of the system without taking into account gluing the slabs to the base and the façade area. The latter can be ordinary and glue. On average, when insulating a wall made of dense material, 5 dowels are used per 1 square meter. meter of wall.

Materials and installation methods

No work is complete without “pressing in” the fiberglass mesh

There are three technologies:

  • The fastening is rigid. In this case, the insulation is fixed with dowels, and the thickness of all layers of plaster is up to 8 mm;
  • The insulation is mounted on movable hinges. The mixture moves freely along the walls and compensates for shrinkage. The thickness of the layers of applied mass is about 30 mm;
  • The thermal insulation layer is fastened with dowels and glue; dowels are used with large caps - disc-shaped. The average number of fasteners is about five pieces.

You will need a vapor-tight plaster composition and a putty reinforcing mortar, a primer, a profile for the sheathing, insulation, and glue. And also, reinforcing mesh, dowels, antiseptic, aluminum strip, sealant, spatula, brushes, roller, sealing tape and paint.

Instructions

If you follow a certain work technology, the construction of a wet facade will not take much time. The structure is built in a certain order:

  • First of all, scaffolding with a protective film or mesh is installed;
  • The walls are cleaned of old paint, dirt, plaster, fungi and mold, efflorescence, then an antiseptic is applied;
  • The wall is leveled to one meter in length, differences of one centimeter are permissible;
  • Surfaces prone to crumbling should be treated with a primer;
  • An aluminum strip is attached to the upper level of the plinth; it protects the lower edge of the insulation from the influence of negative environmental influences and serves as a horizontal leveler.

To ensure that the outer layer of the facade, finished with the wet method, is durable, thermal insulation is applied with glue. The slabs are glued, the process is carried out from the bottom up, by analogy with brickwork, that is, “with dressing”.

  • The gaps between the panels are sealed with polyurethane foam;
  • To strengthen door and window openings, special profiles are used;
  • The junctions to the openings are filled with sealant, then they are sealed with tape;
  • The slabs must be secured with dowels only after the glue has dried;
  • To strengthen window and door openings, special profiles are attached;
  • The adhesive composition is applied to the insulation, and the reinforcing mesh is heated in it;
  • The last step will be to apply all layers of plaster and paint.

Wet facade technology using mineral wool

Main scope of work:

  1. Preparatory operations.
    • dismantling all foreign objects from the façade surface (brackets, fastening elements, etc.);
    • leveling the surface with sealing depressions and cracks, cutting down protruding parts;

  2. cleaning of old coatings, including plaster of slopes of openings, and dirt;
  3. primer of walls.
  4. Installation of scaffolding around the building with protective shelter from rain and sun. At low positive temperatures, a thermal circuit is installed.

  5. Installation of the starting support bar. The U-shaped profile is mounted with a gap of 40 cm from the ground level. To accommodate temperature expansion, 3 cm gaps are left between the horizontal elements. Horizontal installation is carried out using a laser level. The planks are fixed with self-tapping screws and dowels; the fastener spacing is from 10 to 20 cm.
  6. Framing the corners of the building with special corner profiles.
  7. Installation of insulation boards.

    Installation begins from the bottom, in rows resting on the starting strips. Glue is applied in wide strips along the entire perimeter of the slab and in the middle; the unspoken rule is to cover ≥ 40% of the surface of each slab with glue. It is unacceptable to install vertical continuous seams in adjacent rows. The ends of the plates must touch tightly. Adhesive protruding from the seams is immediately removed. After 72 hours, when the glue has hardened, the slabs are additionally secured with dowels with disc heads. The heads are flush with the slab surface. Consumption per 1 sq. m is 6...14 pieces.

  8. Installation of the reinforcing layer. Reinforcement begins with a break of three days after fixing the insulation. Initially, the outer corners of the house, the slopes of openings and the vertical joints of lintels and slopes are reinforced. Then the rest of the wall surface. Execution order:

    • applying glue to thermal insulation boards;
    • laying fiberglass mesh embedded in a layer of glue. Overlap of canvases 10 cm

  9. covering the entire surface with a second layer of adhesive. The total thickness of the reinforcement should be ≤ 6 mm, with the mesh embedded in the glue by 2 mm.
  10. Plastering walls. This is carried out at least 3 days after completion of reinforcement using protective and decorative mixtures.
  11. Final coloring. It is carried out after the plaster layer has completely dried.

This completes the finishing; if done correctly, the house will be well protected from weather influences and will acquire a beautiful, presentable appearance.

Definition

Those who first encountered the technology in question for the exterior decoration of a house often have a question about what features a wet facade is characterized by, what it is from a technical point of view and what structure it has. To give a clear answer to this, let’s look at these aspects in more detail.

The external cladding of the structure must have heat and sound insulation properties. Therefore, a layer of insulation must be located under the decorative outer layer. As a rule, various modifications of foam compounds or mineral wool are chosen as a heat-insulating material. All facade finishes are divided into two main categories:

  • Ventilated.

Insulation is attached to the wall of the house, then strips are installed, to which slabs are in turn mounted - dry plaster, siding, etc. Thus, there is a small air gap between the heat-insulating material and the finishing.

  • Non-ventilated.

The facade has a similar structure as in the first case, but the finishing is adjacent directly to the insulation.

Installation of a wet type facade Source fasadec.ru

Often in the second case, plaster and adhesive compositions are used, applied directly to pre-fixed layers of thermal insulation. Since at the time of application they are in a liquid state, the technology is called “wet”. This is where the name of the façade itself, made using this algorithm, stuck.

Helpful information! Despite the fact that the facade is called wet, the installation of its main thermal insulation elements to the wall is carried out using special fastening elements - dowels and nails with large diameter heads.

Advantages and disadvantages

Insulating walls using the “wet facade” method is one of the cheapest options. The low cost does not allow us to talk about its significant shortcomings. Like any other option, insulation in this way has its pros and cons.

Advantages

  • Low cost of materials and work;
  • Thermal insulation of this type (external) allows you not to take up useful space inside the building;
  • The light weight of the structure does not place unnecessary stress on the foundation; • a wet facade is not only insulation, but also a decorative finishing of walls, which allows you to transform the building;
  • Insulation in this way allows you to modify the surface by simply painting it a different color.

Flaws

It is important to know

All the disadvantages of this type of insulation relate to the installation process

Therefore, when performing work yourself, it is extremely important to take them into account

  • Work should only be carried out at positive ambient temperatures. To be more precise - no less than +5 degrees. If it is necessary to carry out work at lower temperatures, the installation of protective polyethylene casings and the presence of a heat gun are required to maintain the recommended temperature regime;
  • Insulating the facade during rain is not recommended. The adhesive solution may dry unevenly, which will lead to gradual peeling;
  • Direct sunlight on the surface is also not recommended;
  • During strong winds, particles of dirt and dust may fall onto the wet façade.

What is the importance of vapor permeability of the finishing coating?

In facade insulation systems, materials with high vapor permeability should be used. At a room temperature of 20°C and a relative humidity of 55%, its air contains 8 g of water vapor per 1 kg of dry air, which creates a partial pressure of 1238 Pa. Outdoors at a temperature of –10 °C and a relative humidity of 83%, per 1 kg of dry air there is about 1 g of steam, creating a partial pressure of 216 Pa. The difference in partial pressures outside and inside leads to a constant movement of moist air through the wall to the outside. But if there is a layer of material near the outer surface of the wall that does not allow water vapor to pass through, then moisture from the passing air begins to accumulate at the border of the vapor-impermeable layer, causing dampness in the structure. As a result, its thermal protection deteriorates sharply.

What should you pay attention to during installation?

The most dangerous thing for “wet” facade systems is a violation of installation technology. The human factor plays a major role here. To reduce the risk of mistakes, each facility is given personalized technological regulations. The work takes place in three main stages: installation of thermal insulation, reinforcement, application of a decorative layer.

Scheme of laying insulation at the corners of the building

At the first stage, it is very important to correctly, according to the diagram, overlap the insulation slabs and gear them at the corners of the building.

When gluing the slabs, you should pay attention to differences in the plane of the wall. If they are more than 3–5 cm, cavities form under the insulation, which must be eliminated using special spacers.

During doweling

you need to strictly adhere to the technological scheme. The heads must be in the plane of the slab, but in no case are they recessed into it, as this will cause the seating area to break.

In the process of façade reinforcement

It is very important to protect the base layer of plaster from direct sunlight to avoid cracks during the hardening of the composition. In sunny weather, you can use special construction nets that diffuse direct light. At temperatures above 30 °C, reinforcement should not be performed. Compliance with these and other technological subtleties will ensure a long service life of the system.

In accordance with regulations, almost all houses require additional thermal insulation. Even two-brick walls, which were previously considered “safe,” are no longer considered so since 2003. Therefore, insulating a house is a common stage that is used both for the reconstruction of old and for the construction of new buildings. And one of the two most popular methods is a wet facade, the technology of which is applicable to both apartment buildings and low-rise buildings for one owner.

Wet façade system

Wet façade is the latest technology that ensures a minimum level of heat loss. At the same time, interest in this technology is not lost, but, on the contrary, increases. The design of a wet façade looks like a multi-layer sandwich. There are three layers in total, each of which has its own function.

  • The base or reinforced layer is a composition of glue and reinforced mesh that levels the load-bearing wall and also reliably fastens the thermal insulation.
  • The thermal insulation layer is a special board made of insulating material with a low thermal conductivity coefficient (mineral wool, polystyrene foam).
  • The outer layer is necessary as a protective and decorative coating. This layer is made of plaster. It is called wet because the plastering solution is applied wet. At the same time, this technology provides for the possibility of painting the outer layer with a special paint.

Installation technology

Forming a protective layer using this technology is simple - a reinforcing mesh is installed on a flat base, then a layer of insulation, waterproofing and a decorative layer of plaster. If the goal is not to insulate the walls, you don’t have to install thermal insulation material.

For the durability of the facade, the following factors must be taken into account before installation:

  • Preparing the walls. Their surface must be level and free from moisture. This especially applies to wooden structures. Sometimes an auxiliary layer of sheet material is used - moisture-resistant fiberboard or plywood.
  • Insulation fastening. The best option is adhesive-based fixation. If this is problematic due to the properties of the material, you can use mechanical fastening with special dowels. The joints must be treated with sealant for external use.
  • Vapor barrier film. It is mounted on top of the insulation and is designed to remove moisture. If basalt wool is used as a thermal insulation material, installation of a vapor barrier film is not necessary.
  • Mounting polymer mesh. It is attached to the insulation and is designed for better adhesion of the primer layer.
  • Base for plaster. A primer intended for external work is used.
  • Facade plaster. It performs two functions: protecting the thermal insulation and creating the appearance of the facade. To achieve the latter, special paints can be used.

The technology largely depends on the characteristics of the materials used. Therefore, at the first stage you need to choose them correctly.

Features of wet finishing

Currently, on the market of finishing materials and structures that provide insulation of houses, you can find materials with different technical characteristics.

Having even a minimal budget at his disposal, a qualified specialist will find the optimal solution to make the house warm and visually attractive.

Upon closer examination and evaluation of the options, it becomes clear that the wet facade is in no way inferior to curtain structures in terms of heat-saving parameters, while the overall costs of materials and installation are noticeably lower than when using other methods.

The term “wet facade” itself implies that when performing finishing work on the outside of the house, liquid mixtures of various materials are used.

These include plaster mortar, primers and paints. This technology is used for houses made of any building material.

The protective layer resembles a kind of sandwich, which has significant strength with minimal weight.

The advantages of the wet composition are as follows:

  • relatively low cost of installation and materials;
  • the opportunity to attractively decorate the house from the facade;
  • additional sound insulation;
  • ease of updating and repair.

It should be noted that the work is entrusted only to qualified plasterers.

Despite many positive properties, the installation of a wet facade also has some disadvantages. First of all, these features must be taken into account when carrying out work.

The installation technology is designed for certain weather conditions. When drawing up a schedule for finishing work, you need to check it with the weather forecast.

Insulation and finishing of the facade is not carried out at ambient temperatures below +5 degrees. A wet facade is negatively affected by increased air humidity, especially precipitation.

If the installation of insulation is carried out in cool weather, then the scaffolding must be covered with film.

Photo:

When listing the existing disadvantages and disadvantages of installing a wet facade, it should be noted that the finishing material at the formation stage must be protected from direct sunlight.

The sandwich fixed to the wall must be ensured to dry evenly and gradually, otherwise cracks may form on the surface.

While the plastered surface is drying, it is advisable to protect it from the wind, which brings dust and dirt.

For those who undertake to apply a wet facade with their own hands to a wooden or any other house, you need to know about these features before starting installation.

Over the past decades, a large number of opportunities have appeared to beautifully decorate a home without using aqueous solutions. In particular, these are hinged ventilated facades.

This system is reliable and durable in operation. However, despite all the advantages of such solutions, they are suitable for a very limited circle of developers due to their high cost.

A wet façade is not inferior in its operational parameters to modern façade systems under one condition – strict adherence to installation technology.

Photo:

Advantages and disadvantages

The main advantage of using this technology is the combination of decoration and thermal insulation functions .

A number of other positive aspects can also be added to this

  • finishing does not require special skills, and the process itself cannot be called too labor-intensive;
  • provides high-quality insulation of light and weak walls;
  • allows you to save on heating your home;
  • installation can be performed on any surface;
  • improves the quality of sound insulation of house walls;
  • increases the service life of the building;
  • the interior is protected from overheating.

Now as for the disadvantages:

  • the main disadvantage is that insulation work cannot be carried out at air temperatures below 5°C; in case of emergency, when insulating in the cold period, heat guns and scaffolding covered with polyethylene should be used;
  • You should not carry out installation work at high air humidity - a “wet facade” does not tolerate such conditions;
  • The plastered surface needs protection from the wind, since when dust and dirt settle on the fresh finish, the appearance of the coating can be significantly damaged.

Base profile

The technology of finishing a building in this way involves installing a very complex load-bearing structure at the base of the facade. Such an insulation system is installed taking into account a variety of internal and external corners, door and window openings, connections to the base and roof, and various external decorative elements.


During the operation of construction projects, door and window openings are systematically subject to physical and vibration influences. Since materials contract and expand differently when temperatures change, difficulties may arise where facades adjoin the plinth, roof or other buildings. If the finishing area is very large, you will have to lay expansion joints.

In order to be able to do high-quality cladding, before installing the insulation system, special profiles are often installed, through which such unfavorable factors are eliminated. These devices are designed for installation on corners and along the entire plane of the walls of the house. A fiberglass mesh and an elastic membrane for waterproofing are installed on a base made of a polyvinyl chloride frame.

The technology of cladding the walls of a house with a wet facade and installing a thermal insulation system involves the installation of profile strips. They are necessary to ensure uniform load distribution of the thermal insulation elements, which are laid out one after another to prevent moisture from entering the lower and outer rows of insulation slabs.

Installation of such profiles is carried out using self-tapping screws, as well as dowels, the type and quantity of which depends on the weight and type of material used as a heat insulator. Installation must be carried out at a distance of 40 cm from the ground. Taking into account possible expansion, it is necessary to leave a gap of 3 mm between the horizontal strips. For corners, a profile of the appropriate shape is used.

Main stages

Work on insulation with a “wet facade” begins with the preparatory work stage.

Surface preparation

All old hanging elements are dismantled from the facade - brackets for lighting fixtures, antennas and external drainage, as well as signs, canopies and ebbs. Install new brackets for attaching attachments, which should have an increased length taking into account the thickness of the insulating layer.

Inspect the wall surface for cracks, chips and sagging. Cracks are sealed after the causes of their appearance have been eliminated, and the sagging is simply knocked down.

If there are areas affected by fungus, this part of the wall is cleaned to the base and treated with a fungicidal compound using a roller. They also remove old paint, dirt, dust and crumbling areas. Treat the wall with a primer.

If necessary, level the surface. Height differences should not exceed 2 cm - this is the maximum difference in level, which can be compensated for by the thickness of the glue.

Installation of the base profile

On the base, the boundary of the bottom row of mats or insulation sheets is marked. From it, an adjustment is made upward for the distance of the profile mounting holes, and a horizontal level is struck. When insulating a private house, the line, having bypassed the perimeter, should return to this point. When crossing doorways, the line is controlled with a building level.

Then the base profile is mounted using dowels, the length of which depends on the material of the facade. The width of the profile must correspond to the thickness of the insulation. When extending sections along the length, a gap must be left to compensate for thermal expansion.

Installation of thermal insulation material

Installation of thermal insulation on the facade is carried out using mechanical fasteners - umbrella mushroom dowels. But first the insulation sheets are fixed to the wall with glue. Its functions are to compensate for unevenness and prevent the thermal insulation from “sliding” along the facade until installation is completed.

The glue must be applied to the surface of the insulation. The amount of glue and method of application depends on the quality of the surface:

  • if the height differences in level do not exceed 5 mm, the glue is applied to the insulation in a continuous layer with a notched trowel;
  • for unevenness of 5-20 mm, glue is coated around the perimeter of the slab, plus it is applied pointwise in the form of cakes (but not less than 40% of the surface).

The first row of slabs is supported on the starting profile. During installation, make sure that there is no gap at the joints of adjacent slabs, and the difference in height does not exceed 3 mm.

The second row is laid with an offset, which should not be less than 20 cm. The corners of the house must also be designed with the top and bottom rows tied.

When installing thermal insulation, the corners of window and door openings should not fall on the “crossroads” of the slabs. Separate inserts must be cut for these areas.

Finally, the slabs are secured to the walls made of bricks and concrete blocks with disc-shaped dowels and a nail with a thermal head at the rate of 5 pcs. per 1 m 2. The length of the dowel is equal to the thickness of the thermal insulation layer plus the spacer. The spacer part, depending on the materials of the wall construction, must be at least:

  • 60 mm for concrete and solid ordinary bricks;
  • 100 mm for porous bricks and cellular concrete blocks.

When insulating a frame house with OSB walls externally, a different fastening method is chosen - using wood screws with a pressure collar.

Reinforcement

“Soft” and loose insulation boards do not hold the plaster layer well, and so that there are no cracks on it (especially at the seams), the surface is reinforced. For this purpose, a fiberglass mesh is used as an adhesive mixture that is resistant to alkaline conditions.

The mesh should be inside the glue layer; the total thickness of the reinforcing layer is 5-6 mm. This is done as follows:

  • apply the first layer of 3-4 mm;
  • the mesh is literally pressed into the solution with a spatula;
  • level the surface;
  • After the first layer has set, apply the second.

Reinforcement begins from corners and slopes. First, the mixture is applied in a strip of 20-40 cm on each side of the corner, then a perforated corner with a mesh is pressed into the solution. Then, starting from the corner, the remaining mesh sheets are glued, overlapping adjacent sections by 10-15 cm.

After the second layer has set, it is rubbed to a perfectly smooth state - it serves as a base for painting or applying decorative plaster.

Decorative finishing

The drying time of the reinforced base layer depends on humidity and air temperature. As a rule, the holding time under normal conditions is in the range of 24-48 hours and can be found out from the instructions on the glue packaging. At this time, it is advisable to cover the facade with a special film to protect it from external influences.

After the base has dried, the surface is primed and facade paint or plaster is applied.

Creation of a wet facade system using bark beetle plaster

The use of bark beetle plaster for arranging a wet facade is ideal for people interested in creating an individual architectural appearance for their home.


Detailed diagram of creating a wet facade.

Externally, bark beetle plaster is a mixture of white powder with small granules, which influence the creation of a textured layer on the base of the walls. Most often, the size of the granules does not exceed 2.5 mm.

The main advantages of bark beetle plaster include the following:

  1. The material consists of a mineral filler that replaces heavier quartz sand, so you can use it to create a wet facade without fear of excess load on the foundation of the building.
  2. The bark beetle coating can be given any shade if you paint the finished façade with acrylic paints or add coloring pigments to the plaster mixture at the mixing stage.
  3. Bark beetle plaster has excellent vapor permeability, impact resistance and frost resistance, which allows it to be used even in difficult climatic conditions.
  4. The product is environmentally friendly.
  5. Bark beetle plaster is non-toxic, responds well to temperature changes, including sudden ones, and is fire resistant.
  6. The material will last for many years without requiring special maintenance, is resistant to mechanical damage, mold and fungal growths, and will make the facade more aesthetically pleasing.

Installation of bark beetle plaster as part of a wet facade can be divided into several main stages:

First stage. The bark beetle mixture is mixed according to the instructions until a solution suitable for finishing work is obtained.

Second phase. Using a metal spatula, the material is applied to the prepared base in an even layer of medium thickness.

Third stage. Half an hour after application, the bark beetle layer of plaster is processed with a plastic grater as carefully as possible to create the desired pattern - smooth, rounded or spiral.

Requirements for choosing plaster

The most important thing in choosing materials for a “wet facade” is the choice of plaster mixture, because the attractiveness of the facade and its durability depend on it.

According to experts, in this case it is worth choosing elastic plaster mixtures based on silicone. Why them? It’s just that such mixtures will be of the highest quality and most durable. For example, decorative bark beetle plaster would be an excellent finishing option.

Let's consider a number of advantages that make elastic plasters the best choice for installing a “wet facade”:

  1. High moisture resistance. Silicone-based plasters are 100% resistant to moisture. Moreover, due to its elasticity, the composition adheres so tightly to the main surface that water will never reach the walls of the house.
  2. Elasticity. Bark beetle plaster and other silicone-based compounds have increased elasticity. This property protects the finish from the appearance of microcracks after drying. Considering that any building undergoes shrinkage after construction, and some are built in places where they are forced to constantly vibrate, this quality becomes the most valuable.
  3. Preservation of original color. The presence of silicone resins in the compositions under consideration ensures protection of the plaster from fading in the sun. Moreover, on such facades minor damage and scratches are almost invisible.
  4. Durability. It has been virtually confirmed that silicone-based plasters, in particular “Bark Beetle,” last 5 times longer than silicate compounds. Having made the right choice, you get significant savings, allowing you to update the facade no more often than once every 20-25 years!
  5. Lack of care. The elastic composition of the plaster mixture allows you to obtain a smooth, virtually glossy surface to which debris and dust do not cling. Any rain and wind will easily clean such a wall, which means the owner will not have to worry about the need to clean the facade.
  6. Ease of tinting. Unlike most mixtures for installing “wet facades,” silicone plasters are easily tinted in a wide variety of colors and shades. Experts count more than 2,500 shade options to suit any, even the most selective taste.
  7. Low material consumption. If to form a “wet facade” with silicate plasters, at least 5 kg/1 m² of wall surface is spent, then silicone mixtures can boast an economical consumption of 3 kg/1 m². And this is a serious saving if you take into account the entire scope of work.

What is a wet facade system

The most popular materials used for the construction of various structures are brick, concrete or wall blocks. They produce buildings that have good strength, but do not have excellent thermal insulation parameters, so insulation is an indispensable process. For this, wet facade technology would be an excellent solution.

With the help of the work performed, not only high-quality insulation is ensured, but also the decorative design of private houses. All work is carried out exclusively using specialized building solutions. At the end of the process, the walls are plastered, which guarantees their attractive appearance.

The wet facade consists of the following layers:

Construction layerFunctions it performs
AdhesiveProvides reliable fastening of the entire structure
InsulatingGuarantees high-quality insulation of building walls
ReinforcingResponsible for the high strength and reliability of the wet facade, and also creates the basis for easy and quick creation of the next layer
DecorativeActs as a plaster coating that protects heat-insulating materials from external influences and provides a beautiful appearance to the structure

When using this technology, the usable area of ​​the premises is not reduced, since all work is carried out outside.

Video

The “wet facade” technology, despite its apparent accessibility, requires proficiency in plastering skills. And this is not the easiest construction specialization. But if you have time, the necessary tools and desire, then, following the instructions and recommendations of manufacturers of building mixtures, you can do the insulation of a private house with your own hands. Although it is better to entrust this to specialists.

When the term “wet façade” is mentioned, the image of a façade abundantly moistened with water immediately appears in the imagination. But in fact, this method of finishing, of course, has nothing to do with such an association.

This phrase is just one of the attributes of figurative folk speech and cannot be found in textbooks. The question “what is a wet façade?” will be discussed in detail in the material below.

General description of the design


This type of construction consists of several layers that perform a specific function:

  • Glue. It consists of an adhesive mixture, the quality of adhesion of the insulating material to the wall of the building depends on it;
  • Thermal insulation. Insulation using the “wet” method is performed using expanded polystyrene or mineral wool. This choice is determined by the fact that these materials have low thermal conductivity, which allows for high-quality insulation of the facade;
  • Reinforced. A reinforcing alkali-resistant mesh is applied to the insulation attached to the wall, which makes it possible to strengthen the adhesion of the protective and decorative layers to the surface of the slabs. Fastening is done using mineral glue;
  • Protective. Priming the surface allows you to increase the durability of the entire structure;
  • Decorative. Includes finishing decorative plaster, which protects the facade from the harmful effects of climatic conditions and mechanical damage. With its help you can create a facade of almost any shade.

Required Tool

To make it more convenient and easier to work, the tool is taken care of in advance. You will need to perform several types of work, not just plastering itself, so the set of tools is varied.

Mechanical means:

  • Electric drill (screwdriver);
  • hammer drill (prepare an attachment for installing dowels);
  • construction mixer;
  • cutter for cutting profiles.

Hand tools and equipment:

  • spatulas with a blade width of 350 and 80-100 mm;
  • serrated stainless steel trowel with teeth 8-10 mm;
  • hammer;
  • building level;
  • ironer;
  • a grater equipped with sandpaper or an abrasive mesh;
  • roller, wide brush (for priming);
  • grater;
  • grater for forming a decorative structure (300-400 mm long);
  • construction knife for cutting reinforcing mesh sheets;
  • container for adhesive mixture;
  • masking tape;
  • nylon cord;
  • clean rags.

Those who use sheet polystyrene foam will find a home-made device for cutting sheets according to thickness useful. A homemade bow saw (“goat”) is made from wooden slats. A nichrome thread with a diameter of 1.0 mm is used as a cutting “blade” (acceptable limits are 0.8-1.2 mm). Voltage is supplied through a transformer with a power of 250 (up to 400) W, 220/24 V.

Insulation of stone walls from the outside with mineral wool

The plaster is applied directly to the mineral wool.

Definitely, insulating walls from the outside with mineral wool is better than from the inside. This complies with all heat engineering standards and in this case the dew point shifts into the thermal insulation layer. Thanks to this, condensation does not form. Stone walls (made of monolithic concrete, brick, foam block) are insulated using two technologies:

  • along the sheathing - ventilated façade;
  • under the screed - wet facade.

The thickness of the mineral wool for wall insulation in each of the methods will be the same, only the method of laying and finishing the thermal insulation differs. To calculate how many centimeters of thermal insulation cake will be enough in your case, use an online calculator.

Wet facade

This technique involves attaching mineral wool slabs directly to the wall, and applying plaster on top of the insulation. This introduces its own requirements for the choice of material and its characteristics. Basalt wool should be placed under the plaster. It is hard and does not absorb moisture as much. At the same time, even when wet by 30%, it continues to retain heat. According to various estimates, the density of mineral wool for wall insulation should be such as to withstand the weight of the plaster. This is definitely no less than 85 kg/m. cube, and the optimal value varies within 125 kg/m. cube

Before attaching the mineral wool to the wall, it is advisable to level the working surface. If the insulation is laid on a flat wall, then the adhesive is applied in an even layer using a notched trowel. If the working surface is uneven, then the glue is applied with cakes. The layer thickness should be about 3-4 cm. The slabs are laid with the seam offset. Be sure to use plastic dowels, 4-5 pieces for each slab. If mineral wool is laid in two layers, then make sure that the joints of different layers do not coincide.

The last stage of insulating external walls with mineral wool is applying plaster in two passes. A fiberglass reinforcing mesh and corners are embedded in the first layer. The second layer is decorative; it can be smooth or embossed (the so-called bark beetle). The decorative layer is primed and painted. It is necessary to use acrylic-based paints so as not to interfere with the movement of steam from the insulating cake.

So, let’s summarize how to insulate walls with mineral wool using the wet facade method:

  • basalt slabs are glued to the wall with universal glue;
  • each plate is secured with 4-5 dowels;
  • the first layer of finishing is tightened, into which the reinforcing mesh is embedded;
  • a decorative layer of plaster is applied, primed and painted.

The cost of insulation using the two methods described above will be approximately equal, but the execution technique is more complicated for a wet facade. Here you need to have the skills of a painter and plasterer, so to speak, to have a full hand. Theory alone is not enough.

Ventilated façade

For each level of thermal insulation, its own sheathing is erected.

First, let's decide which mineral wool is best for walls insulated under siding (the so-called ventilated facade). This can be either glass wool or soft edged stone wool slabs. The density can be any, since there will be no load on the insulation. When constructing a ventilated façade, the thermal insulation is placed spaced between the sheathing guides. This is why the elasticity of the material is so important. The peculiarity of the technique is the ventilated gap between the insulation and the finish. Thanks to it, the moisture coming out of the heat-insulating cake evaporates, and also cools the house, which is important in the summer.

How to properly insulate walls with mineral wool using the ventilated facade method:

  • the sheathing is being erected;
  • mineral wool is laid at random;
  • wind protection is attached;
  • a counter-lattice is being erected;
  • trim is attached.

The cross-section of the bars for the sheathing is selected no less, and preferably greater, than the thickness of the thermal insulation. The distance between the sheathing bars should be several centimeters less than the width of the insulation. There is no need to glue mineral wool laid out to the wall. For reliability and to avoid shrinkage (if the thermal insulation is very soft), you can fix it with dowels.

The size of the ventilated gap also depends on the height of the walls. Vapor barrier films cannot be used instead of wind protection, as this will cause moisture to accumulate in the insulation. It is necessary to create all the conditions so that steam from the room, having passed the wall and thermal insulation, can easily escape outside.

Basic questions that arise before insulation

Before starting to create a wet facade, many home owners may have various questions. Often a problem arises with the choice of insulation and what specific materials and components may be needed during installation work.

Which insulation to choose

  1. Organic systems. They use fairly cheap foam. Reinforcement is performed using a special reinforcing mass of organic origin.
  2. Mineral. The mineral wet facade is made using high quality mineral wool. A mixture of mineral origin is used for reinforcement.
  3. Combined. Such insulation systems require the use of high-quality foam. Raw materials of mineral origin will be used for finishing.
  • Price. The cheapest insulation option is polystyrene foam. Many buyers prefer it, despite its fairly high fragility rating.
  • Difficult to install. Foam plastic is considered a simpler option, because it has a fairly rigid structure and can be easily processed.
  • Fire safety. The fire safety indicators of the insulation used play a huge role. Polystyrene foam is a flammable material, so it should be additionally treated with special solutions - fire retardants. Basalt wool will not burn and can easily withstand temperatures that reach 1000 degrees.

Not least important is the thickness of the insulation used. There are a huge number of different insulation options on sale today, each with individual parameters and characteristics.

On average, the thickness of the slabs can be from 25 to 200 mm.

At the same time, a very thick layer of insulation will result in too high a temperature inside the room. In addition, preference should be given to materials produced by well-known companies, which to some extent is a guarantee of their quality.

What materials and components will be required?

It is imperative to use a base or starting profile

It is very important in this situation that its width must correspond to the thickness of the insulation used for the house. In addition, you need to pay attention to the quality of the material. To fasten the profiles, you will need dowel-screws or dowel-nails measuring 6/40. Sometimes you need extended dowels 6/60 if the facade of the house is plastered with a thick layer. You will also need a high-quality primer. It will be used at the stage of preparing the surface for further insulation. To securely fix the insulation, a special adhesive solution is purchased

Preference should be given exclusively to those adhesive mixtures that are intended for installing insulation. Be sure to buy enough insulation. It is better to purchase this material with a small reserve in case some slab is damaged during installation. In order to strengthen the insulation mechanically, you may need dowel mushrooms. Their length must correspond to the thickness of the insulation sheet along with the length of the spacer element present. You will need a reinforcing mesh and a special mixture for reinforcement. For exterior work, additional decorative finishing materials will be required, which may differ in each individual case.

Rating
( 1 rating, average 5 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]